Our Emergency team firstly dismantled and inspected the motor and a Baker test was conducted to identify any weaknesses in the motor’s insulation. Based on the results, the decision was made to fully overhaul the motor.
Overhaul
All necessary components were repaired or replaced including the fitting of new bearings. Oil seals and full overhauls of the force vent fan and drum unit were carried out and the asset was reassembled.
Outcome
Laser alignment was carried out with a test run to ensure the motor was operating correctly before returning to the customer. The repair was carried out within 24 hours, enabling the customer to resume production and meet their deadline.