Home / Case Studies / A Large Industrial Company

A Large Industrial Company

Project: Electrical Services

 

The challenge

As part of its expansion to a new facility, a large industrial company required electrical installation services. The move took place during the Covid-19 pandemic and required a dedicated team led by an electrical engineering specialist to configure the electrical infrastructure to suit the new requirements

Houghton International’s in-house electrical services team carried out the design, installation, testing and certification of new electrical infrastructure, reconfiguring existing supplies as necessary to provide a cost-effective solution to meet the company’s needs, adhering to all current regulations.

The solution

Houghton International’s in-house project management team devised a robust plan to complete the project within the challenging timescale given.

To begin with, the existing electrical infrastructure was mapped out and assessed against the business’s needs for a lean, flexible workspace. Electrical tests were then used to locate, identify and correct any faults found in the customer’s electrical systems. The existing wire and cable systems (up to 400 amps) were then redesigned and upgraded in line with the customer’s needs, keeping costs low and reducing lead times.

Lighting across the building, including the offices and factory floor, was upgraded to high efficiency LED systems to improve factory operations, working conditions and save running costs. A number of offices, conference rooms, canteens and other support areas were also created or reconfigured to suit the company’s requirements.

The site operates a number of overhead gantry cranes up to 40 tonnes. The cranes’ control systems were reconfigured, replacing obsolete contactors to prevent hazards such as electrical overloads.

All machinery and test equipment was safely disconnected from the previous site before being installed and configured to the relevant safety standards in the new site. In addition, new facilities were added and safety systems upgraded with the addition of interlocks, warning lights etc.

Why Houghton International

Drawing on over 25 years’ of experience in electrical services, Houghton International’s team of electrical engineers was able to carry out a large-scale factory installation in a limited time frame.
Houghton International could offer 24/7 responsiveness to ensure a smooth transition.
In-house project management throughout the entire process.

Related Services

Electrical Services
On-site Electrical Testing

The Results

Houghton International was able to carry out a full factory installation within a short period so the company expansion could be completed on schedule. With 24/7 availability, the electrical services team were able to allocate resource to ensure the factory installation was completed within the required timescale.

Houghton International’s extensive knowledge of both electrical and mechanical systems meant the customer did not have to source work from multiple providers; all work was carried out by one team to ensure a seamless and effective transition.

Want to know more about our past projects?

Get in touch using the boxes below and we’ll get back to you.

This field is for validation purposes and should be left unchanged.

Sign up to our newsletter

This field is for validation purposes and should be left unchanged.